(+63 046) 430-2294|+63 977-208-6945| +63 950-658-1288
Access Map
Company Profile
Request/Contact
News/Blogs
Real
texture
Onda's products are one-of-a-kind, made-to-order products created by craftsmen one by one.
It combines the strength, luxury, and safety of the real thing, and various ingenuity is put into each manufacturing process.
One of its features is the plating process to increase strength. The galvanizing process, which is performed in a pool of molten high-purity (98.5%) zinc ingots, increases the surface strength of the coating film, making it possible to create products that are resistant to temperature, light, dryness, salt water, water, and impact.
The second feature is the production of a luxurious finish by hammering. In addition, we supply raw materials from Japan to the Philippine factory, and we are completely confident that safety and quality are taken into consideration, such as conducting content inspections and strength inspections for lead (Pb), a hazardous substance .
ONDA's Products
|
Other Products
|
|
Painting
|
||
Surface Treatment
|
||
Welding
|
Quality
details
1. Materials
- Wrought Iron/Cast Iron
- Country of origin of iron: Japan
- Composition (impurities)
- C 0.02% or less
- S 0.35% or less
- Mm below 1.54%
- P 0.009% or less
- S 0.01% or less
- Cu 0.14% or less
- Ni 0.15% or less
- Mo 0.08% or less
- Nb 0.03% or less
2. Plating
- Whole product
- Hot-dip galvanizing (JIS H 8641)
- Thickness 100μm (average)
- Zinc coverage 536g/㎡
- Supervised by the Building and Repairs Department, Minister of Land, Infrastructure, Transport and Tourism
- "Building Construction Common Specifications" Chapter 14 Metal Work
- 14.2.3 Zinc plating of iron Class B compliant product
- Plating material (manufactured by Mitsui Kinzoku)
- Distilled zinc type I
- Zn 98.5% or more (JIS H2107)
- Pb 1.3% or less
- Fe 0.025% or less
- Cd below 0.4%
3. Paint
- Substrate adjustment
- JASS13 Metal work
- 2.2.(3)(ii) Chemical conversion coating
- <Undercoat> JIS A 4704
- Two-component epoxy paint (manufactured by Nippon Paint)
- Coating thickness 40μm or more
- Standard colors are black, transparent, and bronze.
- <Topcoat> JIS A 4704
- Two-component polyurethane paint (manufactured by Nippon Paint)
- Coating thickness 30μm or more
- Black and white are standard
- 2 to 3 special colors can be used at the same time
Steel strength
Steel strength
■ Tensile Test Report
Tensile test | |
---|---|
Test pieces | Galvanized steel plate 10.4×7.89 (mm) Test room temperature 16°C |
Test method | Punctuation distance 25mm |
Test results | Yield point 299N/m2 Tensile strength 433N/m2 Elongation 39% |
Test pieces | Galvanized steel plate 10.4×7.90 (mm) Test room temperature 16°C |
Test method | Punctuation distance 200mm |
Test results | Yield point 308N/m2 Tensile strength 423N/m2 Elongation 20% |
■ Bend test report
load test | |
---|---|
Test pieces | Galvanized steel plate 300×40×t7.95 (mm) Test room temperature 23℃ |
Test method | Place it on a bending jig (distance between supporting points: 200 mm, supporting point radius: 15 mm) and apply a compressive load (push metal inner radius: 5 mm) to the center. In addition, deflection is measured with a dial gauge. |
Test results | 1) Load 0.5kN deflection 0.36mm 2) Load 1.0kN deflection 0.66mm 3) Load 1.5kN deflection 0.94mm 4) Load 2.0kN deflection 1.22mm 5) Load 2.0kN deflection 1.51mm 6) Load 2.5kN deflection 1.79mm |
Plating strength
Plating strength
■ Hot-dip galvanizing test report
■ Corrosion resistance test report
Neutral salt spray test (continuous 72 hours spray) | |
---|---|
Test pieces | Galvanized steel plate 100 x 150 x 3 (mm) |
Test method | The test was conducted according to 7.1 of JIS H 8502. |
Test results | After spraying for 72 hours, no red rust is observed. |
Plating plantplating factory
Degreasing of products and selection of materials are important for plating. In order to improve quality, products are washed with acid and alkali and immersed in high-purity zinc pools, which requires a very large investment in pool equipment.
First, wastewater treatment equipment for pollution prevention. Wastewater from plating contains highly toxic substances, so a wastewater treatment facility is essential for detoxification. Preparing a zinc pool requires large equipment. Furthermore, in order to keep the zinc molten, it must be heated with a burner for 24 hours. This is because once the fire is extinguished, it takes several days to remelt. Our company was founded as a button manufacturing factory, so we already had plating pool facilities. Therefore, we are in an environment where existing equipment can be utilized to achieve plating processing.
We also place great importance on the purity of the plating. Purity is invisible to the naked eye, so careful selection is required. We have also inherited the knowledge of plating from the time when we were a button manufacturing factory, and we are making use of it in the manufacture of wrought iron.
When selecting a steel material, if a material with many impurities is selected, zinc will not adhere to the material. At our company, we do not take countermeasures such as supplementing with zinc paint. This is because we think that it will not be alloyed and that there will be problems with adhesion.
Pool for base treatment before plating
Molten plating pool of 98.5% zinc ingot
Put the product after surface treatment into the plating pool
Coating surface strength
coating surface strength
■ Accelerated weather resistance test
Test pieces | Worth iron test piece 100×40 t=8 |
---|---|
Test method | JIS K 5600-7-7 General test method for paint Evaluation was performed by visual inspection. |
Test conditions | Radiation source Xenon arc lamp 7.5 kW Water-cooled filter system Method 1 Irradiance 100 W/m2 (tunable wavelength range 300 to 400 mm) Test time 100 hours Accumulated irradiance 36 MJ/m2 Black standard thermometer reading 65±2°C wet cycle continuous Operation Wetting time 18 minutes Drying time 102 minutes (testing machine: Super xenon weather meter SX75 Suga Test Instruments Co., Ltd.) |
Test results | No abnormalities were observed. |
■ Salt spray test (72hr)
Test pieces | Worth iron test piece 100×40 t=8 |
---|---|
Test method | JIS K 5600-7-1 Paint general test method Two diagonal lines were drawn on the lower half of the coating film with the cutting edge of a cutter knife so as to reach the base material. For the evaluation, a visual inspection was performed for each of the areas with and without flaws. However, 3 mm on each side of the scratch on the paint film was excluded from the observation. |
test time | 72 hours |
Test results | Scratches-free area: blistering of the paint film is observed. Scratched area - Swelling of the paint film is observed. |
■ Coating thickness measurement
Microscopic cross section measurement | |
---|---|
Test pieces | Worth iron test piece 100×40 t=8 |
Test method | Film thickness was measured by microscopic cross-section measurement. In addition, the measurement point was one arbitrary point. (Using paint borer model 518 manufactured by Eriksen Co., Ltd.) |
Test results | 50μm |
Test results | Scratches-free area: blistering of the paint film is observed. Scratched area - Swelling of the paint film is observed. |
■ Cross-cut test
Test pieces | Worth iron test piece 100×40 t=8 |
---|---|
Test method | JIS K 5600-5-6 (Cross-cut method) General test method for paint Cut interval: 1 mm. Uses a single-flute cutting tool. |
Test results | Category 2 |
■ Pencil scratch test
Test pieces | Worth iron test piece 100×40 t=8 |
---|---|
Test method | JIS K 5600-5-4 General test method for paint The hardness of the hardest pencil that did not cause an agglomeration test (scratches or breakage of the coating material on the surface can be observed with the naked eye) was taken as the pencil hardness. |
use a pencil | (Foundation) Japan paint inspection association inspection finished, made by Uni, MITSUBISHI. |
Test results | 3H |
■ Immersion test (water resistance test)
Test pieces | Worth iron test piece 100×40 t=8 |
---|---|
Test method | JIS K 5600-6-1 General test method for paint Evaluation was made by visual inspection of discoloration, swelling, peeling, etc. |
test solution | Deionized water, test temperature: 23±2°C, immersion time: 24 hours |
Test results | No abnormalities were observed. |
■ Impact deformation test
Test pieces | Worth iron test piece 100×40 t=8 |
---|---|
Test method | JIS K 5600-5-3 General Test Method for Paints The evaluation was based on the maximum height at which cracking and peeling due to deformation due to impact did not occur. |
Throwing type | Radius 6.35±0.03mm, Cradle: Flat |
weight of weight | 500±0.5g |
Test results | More than 50cm |
■ Accelerated weathering test combined cycle test
Test pieces | wrought iron painted plate |
---|---|
Test method | 1.1 Accelerated weather resistance test (xenon arc lamp method) JISK5600-7-7:2008 General test methods for paints - Part 7: Long-term durability of coating film - Section 7: Accelerated weather resistance and accelerated weather resistance (xenon lamp method) went in order. 1.2 Combined cycle test JISK5600-7-9:2006 General test methods for paints - Part 7: Long-term durability of coating film - Section 9: Cyclic corrosion test method - salt spray/dry/wet. |
Test condition 1.1 | 1.1 Accelerated weathering (daylight filter) device: Super xenon weather meter SX75 Suga tester Radiation source: Xenon arc lamp 7.5kW water-cooled Radiometer: Photoreceiver for main unit (EC), irradiance meter RAX34C Suga tester black standard temperature : 65±2℃ Test piece wetting cycle: B [Discontinuous operation, wetting time 18 minutes, drying time 102 minutes] Test time: 1,000 hours Irradiance: 100 W/m2 (tunable wavelength range 300 to 400 nm) Radiation exposure: 360 MJ/m2 Evaluation: visual inspection |
Test condition 1.2 | Equipment: Combined Cycle Tester CYP-90LA Suga Tester Method: Appendix C (normative) Cycle A cycle test conditions 1) Salt spray: 35±1°C 2 hours 2) Drying: 60±1°C 20-30% RH 4 Time 3) Wetness: 50±1°C, 95% RH or more, 2 hours/ cycle 8 hours , number of cycles: 60 times Presence or absence of scratches: No scratches. Evaluation: Visual evaluation of appearance |
Test results | 1.1 Discoloration is observed. 1.2 White rust is found on the edges. |
Coating film safety
Film Safety
■ Pb (lead) qualitative analysis
Test pieces | Coating flakes (powder) |
---|---|
Test method | Arc emission spectroscopy detection sensitivity (1 to 10 ppm) |
Test results | not detected |
ABOUT PRODUCT WARRANTY
Product warranty
This warranty promises free repair under the specified period and conditions. Therefore, the content of this warranty does not limit the rights of the customer, so please contact the shop where you purchased the product or Onda directly regarding repairs after the warranty period has expired.
Guarantor | Onda Group of Companies, Inc. |
---|---|
Guaranteed person | the owner of the goods |
Shipping | Wrought iron products sold at Onda |
Warranty details | We will repair, free of charge, any defect in quality, deterioration in performance or function caused by normal handling within the warranty period . |
Warranty period | 1 year after completion of installation of the product. However, the owner bears the burden of proof as to the time of completion . |
Disclaimer | Even within the warranty period, if the cause is as follows, repair will be charged.
|